Operations consulting · based near Poznań · working EU-wide

Micromobility fleet operations, fixed from the ground up.

I help shared mobility operators, refurbishment centers and distribution centers run tighter day-to-day operations: rebalancing, warehousing, spare parts and refurbishment workflows that hold up at scale.

WarehouseWorkshopFleet
EU-27+UK, Switzerland and Norway
8modules covering the full operational stack
200+people in teams I have led
01 · WHO I HELP

Three ways in

Pick what you run and see where I can help fastest.

For refurbishment centers

Running vehicle refurbishment at scale?

  • End-to-end refurbishment process design: intake, diagnostics, repair, quality control, return to fleet
  • Spare-parts and battery supply-chain set-up, including supplier and manufacturer relationships
  • Warehouse and service-hub layout for vehicle flow, plus inventory tracking
  • Technician SOPs, checklists and quality standards for a consistent turnaround
  • A custom app to track vehicles through refurbishment, once the spreadsheet stops working
3 refurbishment programmes built from scratch across EU markets
Talk about refurbishment
For fleet operators

Need the day-to-day fleet fixed?

  • Day-to-day operations design: rebalancing, charging, patrolling, parking compliance
  • Warehousing and spare-parts supply chain set up properly, alongside refurbishment workflows
  • Technology and telemetry vendor selection from an operational point of view
  • Hiring and structuring the field team, including onboarding and KPIs
8 modules covering the full operational stack, see below
Talk about fleet ops
For distribution centers

Managing spare parts at scale?

  • Spare-parts inventory management: stocking levels, categorisation, demand forecasting
  • WMS integrations and rollout, tailored to inbound and outbound flow
  • Structuring warehouse teams: pickers, inbound/outbound coordinators, shift leads
  • 3PL and supplier coordination for consistent parts availability across markets
EU-wide spare-parts and warehouse operations experience
Talk about distribution
02 · PROJECTS

Real depots, real fleets, real refurbishment

Photos from projects: warehouses, refurbishment lines and fleets I designed and launched. No stock photography.

Fleet ready for deployment
FleetFleet ready for deployment
Refurbishment workshop walkthrough
RefurbishmentRefurbishment workshop walkthrough
Team briefing on the warehouse floor
TeamTeam briefing on the warehouse floor
Refurbishment workstations, set up and ready
RefurbishmentRefurbishment workstations, set up and ready
Spare-parts refinishing booth
RefurbishmentSpare-parts refinishing booth
E-bike charging station, Nové Chabry
FleetE-bike charging station, Nové Chabry
New distribution center, fit-out complete
DistributionNew distribution center, fit-out complete
Pallet racking installed and ready
DistributionPallet racking installed and ready
Racking installation in progress
DistributionRacking installation in progress
Assembly and refurbishment zone
RefurbishmentAssembly and refurbishment zone
Refinishing booth ventilation install
RefurbishmentRefinishing booth ventilation install
Fleet processing and spare-parts storage
FleetFleet processing and spare-parts storage
New warehouse racking, install phase
DistributionNew warehouse racking, install phase
03 · TEAM

We know the sector from the inside

I run consulting projects personally. On larger rollouts I work with trusted refurbishment and data specialists.

Radosław Piwowarski

Radosław Piwowarski

Founder of MicroAdvisory

Customer-oriented, safety-driven operations leader with 18+ years across warehousing, supply chain management, e-commerce and micromobility in the EU.

I have launched and scaled logistics operations from the ground up, building warehouses, structures, processes, KPIs and roles, and managing multifunctional teams of 200+ people. My focus is continuous improvement and excellence in daily operations, from hiring and training through to steady-state performance.

Partner experts
P. BowtruczukSenior Operations & Refurbishment Expert

13+ years running refurbishment and field-service operations for shared mobility fleets, with a focus on intake-to-return workflows, technician training and vehicle lifecycle management across multiple EU markets.

A. WiśniewskaFleet Operations & Data Lead

Background in fleet rebalancing, telemetry and KPI reporting, turning raw trip and utilisation data into operational decisions that cities and operators actually act on.

04 · SERVICES

Operations consulting, module by module

Eight areas covering the full lifecycle of operations, from the warehouse floor to steady-state fleet performance. Click a module for details.

01

Fleet Operations & Management

Rebalancing, charging, patrolling and operating cost.
  • Designing and optimising day-to-day processes: rebalancing, charging and battery swaps, patrolling, parking enforcement.
  • Field-team staffing models: headcount, routes, shift patterns and metrics (SLAs, response time, vehicle availability).
  • Selecting and rolling out route-planning and task-assignment tools for field teams.
  • Seasonality analysis and fleet-scaling plans: deploying and withdrawing vehicles by season.
  • Operating-cost optimisation: cost per ride, cost per vehicle, cost per rebalancing trip.
02

Logistics & Warehousing

Location, layout, spare parts, 3PL and WMS.
  • Selecting warehouse and service-hub locations: accessibility, cost, distance to the operating zone, health & safety.
  • Warehouse layout for vehicle flow: intake, servicing, charging, dispatch.
  • Spare-parts and battery supply chain, including supplier and manufacturer relationships.
  • Sourcing and evaluating 3PL partners across EU markets for transport, storage or last mile.
  • Specifying and setting up battery-storage containers to fire-safety requirements.
  • Transport-fleet planning (vans, trailers) for rebalancing and warehouse resupply.
  • Implementing a warehouse management system (WMS) and inventory-tracking procedures.
03

Vehicle Refurbishment & Servicing

From street intake back to the active fleet.
  • Refurbishment process: field intake → diagnostics → repair or parts replacement → quality control → return to fleet, for e-bikes and e-scooters.
  • Component-level refurbishment: motors, controllers, IoT and telemetry units diagnosed, repaired or rebuilt rather than replaced.
  • Sourcing suppliers of tools, diagnostic equipment and workshop machinery.
  • Refinishing partnerships that give worn spare parts a second life instead of scrapping them.
  • Standardising service procedures (SOPs) and technician checklists.
  • Quality standards and lifecycle rules: repair, salvage or scrap.
  • Battery lifecycle: charge cycles, wear diagnostics, safe storage and recycling.
  • Repair-tracking and vehicle service-history systems.
04

Technology & Custom Apps

Vendors, IoT integrations and tailored apps.
  • Custom apps for refurbishment tracking, spare-parts inventory or field-team tasking when off-the-shelf tools don't fit.
  • Advisory on the rider-facing app: booking, payments, vehicle unlock, availability map.
  • Selecting fleet-management systems and IoT integrations.
  • Functional specifications with product teams, from the operational point of view.
  • Comparing telemetry, GPS-lock and anti-theft vendors.
  • Rolling out operational apps for rebalancing and servicing teams.
05

Hiring & Team Management

Structure, recruitment, onboarding and KPIs.
  • Operations department structure: field technicians, coordinators, regional managers.
  • Recruitment support: role profiles, assessment criteria, interviewing.
  • Onboarding programmes plus technical and health & safety training.
  • Incentive schemes and KPIs for field teams.
  • Building the launch team for a new depot, refurbishment center or city.
06

Process, Audit, Strategy & Finance

Bottlenecks, process maps, market entry.
  • Auditing existing operations: bottlenecks and improvement recommendations.
  • Mapping and redesigning workflows for time, cost and quality.
  • SOPs and process documentation across warehouse, refurbishment and field operations.
  • Warehouse and spare-parts flow audits: where stock, time and money leak.
  • Market and competitor analysis plus a city launch plan: timeline, budget, resources.
  • Financial modelling: unit economics, cost per ride, cost per refurbished vehicle.
07

Safety, Compliance & Sustainability

Regulation, incidents, tenders and energy.
  • Compliance with local regulations and safety requirements.
  • Support with documentation for city micromobility tenders.
  • Parking rules and operating-zone proposals within existing permits.
  • Vehicle safety standards and incident-response procedures.
  • Quality sign-off criteria before refurbished vehicles return to the fleet.
  • Green energy: solar-assisted charging, lower-carbon depot power, energy-use audits.
08

Data, Analytics & KPIs

Metrics, dashboards and board reporting.
  • Defining and implementing core KPIs: utilisation, uptime, availability, service response time.
  • Real-time dashboards for fleet and team monitoring.
  • Waste reporting: batteries, tyres and end-of-life components tracked against legal and ESG requirements.
  • Periodic operational reports for investors and the board.
05 · CASE STUDIES

What a project actually looks like

One anonymised example per segment. Client names, locations and figures are under NDA; more detail on a call.

Refurbishment10 weeksDACH region

Refurbishment turnaround cut in half across two depots

A regional operator replaced an ad-hoc repair process with a standardised intake-to-return workflow, consolidated spare parts across two depots and cut average refurbishment turnaround from 11 days to 5, with no added headcount.

11 → 5 days
Average refurbishment turnaround, before vs. after
Before11
After5
Download the one-pager (PDF)1 page · anonymised · details under NDA
Fleet operator12 weeksNordic region

Rebalancing cost per vehicle cut by a third across a 400-vehicle fleet

A multi-city operator redesigned its rebalancing routes and shift patterns, introduced clear SLAs for field teams and cut rebalancing cost per vehicle by roughly a third, without reducing service availability.

−33%
Reduction in rebalancing cost per vehicle
Before100
After~67
Download the one-pager (PDF)1 page · anonymised · details under NDA
Distribution center8 weeksDACH region

Three regional spare-parts hubs consolidated into one

A distribution center replaced three loosely tracked stock points with a single WMS-backed inventory, cut stockouts on critical parts and shortened average parts-fulfilment time from days to hours.

Days → hours
Average parts-fulfilment time, before vs. after
Download the one-pager (PDF)1 page · anonymised · details under NDA
06 · WORKING TOGETHER

Four engagement models

I match the format to the stage your organisation is at.

One-off Audit

Review of a selected area (operations, logistics or servicing) with a findings-and-recommendations report.

For operators diagnosing a problem

Project Implementation

Designing and implementing a specific process, e.g. refurbishment, a warehouse system or an operations app.

For teams scaling fleet or refurbishment

Ongoing Advisory

Regular operational and strategic support on a monthly cycle.

For organisations needing continuous support

Interim Management

Temporarily filling an operational role, e.g. Head of Operations, during recruitment or a fast scale-up.

For companies in transition or scaling fast

How a project runs

  1. Initial callUnderstanding your fleet scale, needs and operational challenges.
  2. DiagnosisAnalysis of current processes, operational data and pain points.
  3. Scope proposalChoosing the engagement model and a realistic timeline.
  4. ImplementationRolling out recommendations, processes or tools with your team.
  5. Wrap-upFinal report plus optional post-implementation support.

Need to train your team?

On-site training for technicians and warehouse staff, plus online courses (in Polish) with certificates and narration.

07 · FAQ

Before you write

The questions that come up on nearly every first call.

How much does this cost?

It depends on scope. A one-off audit is priced differently from implementation support or ongoing advisory. Most projects are quoted as a fixed project fee or a monthly retainer once we've scoped the work on the first call. There's no published day rate because the right structure depends on what you actually need.

How long does a project take?

A focused operations or warehouse audit usually runs 3–6 weeks. Implementations, such as a refurbishment build-out or a new warehouse system, typically run 6–12 weeks depending on scope. Retained advisory runs longer, often quarterly or ongoing.

Do you work with only one operator per market?

Not automatically. I flag any potential conflict before taking on a new project with an operator or refurbishment center in a market where I'm already working. Confidentiality between clients is kept throughout: details of one project are never shared with another.

Can you sign an NDA and handle confidential data?

Yes. NDAs are standard and are signed before any confidential fleet, warehouse or financial data is shared. That's why client names and figures on this page are anonymised.

Which markets do you cover?

EU-27 plus the UK, Switzerland and Norway. I'm based near Poznań and travel as projects require; most audit and planning work can be done remotely, with in-person time for depot visits, workshops and implementation weeks.

What languages do you work in?

Polish and English day to day. Documentation in other languages is prepared together with your own team; I don't translate official documents.

08 · CONTACT

Have a fleet, warehouse or refurbishment problem?

I take on a limited number of projects at a time. Fill in four fields and your email client will open with a note already drafted, or just call.

Opens your email client with these details filled in. Nothing is sent from this page or stored anywhere.

LocationNear Poznań, Poland, working EU-wide
LanguagesPolish, English
Pick a time in the calendar